The newest addition to Hmlet Japan’s portfolio, Hmlet Kamata, is scheduled to open in March 2022. This property, featuring “a life with travel nearby”, is located 7 minutes away from Tokyu Kamata Station (Keikyu Main Line and Airport Line) and JR Kamata Station (JR Keihin Tohoku Line, Tokyu Ikegami Line and Tamagawa Line). Kamata’s direct access to Haneda Airport and Shinagawa JR Station gives you a smooth connection to traveling by air and land.
Connected to the Kamata Station are a few shopping complexes, including Granduo Kamata and two shopping streets. Whether to stop by for coffee on your telework days or to hit the gym after work, everything you need is within walking distance.
All rooms are south-facing, with gentle sunlight coming in through two windows and complemented by dark-toned wooden furniture, creating a vintage urban sentiment. To support the telework lifestyle, we equipped the rooms with chairs and desks that balance productivity and comfort, giving you options to choose what best suits your needs.
*Quotes and Displayed Prices: Quotes will be provided separately by Hmlet. The displayed price for the All Inclusive Plan is a reference price for contracts of 2 months or more but less than 3 months. Please contact us as details will vary depending on the contract period and conditions.
The 360-degree VR technology allows you to get a feel for the property as if you were there.
Layout | 1BR |
---|---|
Size | 30.00 sq.m. / 322.91 sq.ft. |
Rent |
|
Max Capacity | - |
Deposit | Ask |
Minimum Lease Term | 1Month |
Pet | Ask |
---|---|
Parking | |
Note | *Utilities: Included in the rent *Cleaning service: Available (extra charge) *The displayed price for the All Inclusive Plan is a reference price for contracts of 2 months or more but less than 3 months. *English Available *Support During Stay Available *No Agent Fee, No Key Money, No Management Fee |
Address | 4-31-6 Kamata, Ota-ku, Tokyo |
---|---|
Transportation | 7 minutes from Kamata Station on the JR Keihin-Tohoku Line 7 minutes from Keikyu Kamata Station on the Keikyu Main Line |
Structure | Reinforced Concrete |
---|---|
Completion | April, 2020 |
© 2025 Japan Living Guide. All Rights Reserved.